Divertable Traffic from Road

Economics of Coastal Shipping with Respect to Road Movement – Case Studies

Road Road + Sea

Distance Cost/TEU Distance Cost/TEU

Origin Destination Commodity Parcel Size

(TEU)

kms Rs kms Rs

Viability

By Sea

Tuticorin Chennai Container 200 579 23450 1390 22993 Viable

Bangalore Trivandrum Container 200 753 27955 1757 39052 Unviable

Mumbai Kolkata Container 200 1987 60355 3927 50392 Viable

Mumbai Chennai Container 200 1329 44854 2722 40029 Viable

Jamshedpur Bangalore Container 200 1834 55708 2110 63751 Unviable

Jamnagar Mumbai Container 200 847 31445 805 22907 Viable

Tuticorin Kollam Container 200 281 18968 354 17034 Viable

Mangalore Udaipur Container 200 1686 51212 1798 40580 Viable

* MT = Metric Tonnes

General Cargo - Container : Tuticorin to Chennai by Sea

From To Mode NM KM Time (Days)

Stage 1:

Stage 2: Tuticorin Chennai Sea 750 1390 3.9

Stage 3:

Stage 4: Chennai Tuticorin Sea 750 1390 3.5

Total (KM) 1390

Vessel details

DWT: 4442

GRT: 2887

Speed: 8 NMPH

Bunkers (HFHSD) @ Sea per day 5.5 MT 25899 @Tuticorin

MT 25899

Bunkers (HFHSD) @ Port per day 1.5 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 200 TEU 3600 T

Charter Hire in INR 135000 per day

Stage 1: 0 0 0

At 0 Rate(INR) Unit in INR

No.of days 2.0

Stuffing Charges TEU 0

Lift on to Trucks TEU 0

Road Transport from 0 0 200 TEU 00

Stage 2: Tuticorin Chennai Sea

Preberthing time (No. of Days) at Tuticorin 0.0

Bunkers before berthing - HFHSD 0 25899 TEU 0

on berthing at Tuticorin

No. of Days 2.0

Berth Hire Charges 2887 0.48 per GRT/shift 8315

Pilotage 2887 4.55 per GRT 13136

Port Dues 2887 2.35 per GRT 6784

Bunkers at berth - HFHSD 3 25899 TEU 77697

Stevedoring 200 4500 TEU 900000

Wharfage# 200 TEU 0

Misc.& Incidental LS 20000 1025932

# Included in Stevedoring

Steaming time from Tuticorin Chennai

No. of Days 3.9

At sea - Bunkers - HFHSD 21.5 25899 per MT 556424

556424

At Chennai

Preberthing time (No. of Days) at Chennai 0.5

Bunkers before berthing - HFHSD 0.75 25899 per MT 19424

on berthing at Chennai

No. of Days 2.0

Berth Hire Charges 2887 3010 per GRT 18060

Pilotage 2887 4.99 per GRT 14406

Port Dues 2887 2.05 per GRT 5918

Bunkers at berth - HFHSD 3 25899 TEU 77697

Stevedoring 200 5000 TEU 1000000

Wharfage# 200 TEU 0

Misc.& Incidental L.S 30000 1165506

# Included in Stevedoring 2747861

Stage 3: 0 0 0

No. of Days 3

Road Transport from 0 0 200 Per TEU 0

Lift off from Trucks 200 Per TEU 0

Destuffing Charges at Destination 200 Per TEU 0

0

Stage 4: Chennai Tuticorin Sea on Ballast

No. of Days 3.5

Steaming time from Chennai Tuticorin

At sea - Bunkers - HFHSD 19.3 25899 per MT 500781

500781

Distance

Rate (Rs/MT)

TATA Consultancy Services

Bangalore to Mangalore by Road Mangalore to Vizhinjam by Sea Vizhinjam to Thiruvananthapuram by Road

General Cargo Containers :

From To Mode NM KM Time (Days)

Stage 1: Bangalore Mangalore Road 347

Stage 2: Mangalore Vizhinjam Sea 750 1390 3.9

Stage 3: Vizhinjam TVM Road 20

Stage 4: Vizhinjam Mangalore Sea 750 1390 3.5

Total (KM) 1757

Vessel details

DWT: 4442

GRT: 2887

Speed: 8 NMPH

Bunkers (HFHSD) @ Sea per day 5.5 MT 25513 @Tuticorin

MT 25513

Bunkers (HFHSD) @ Port per day 1.5 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 200 TEU 3600 T

Charter Hire in INR 135000 per day

Stage 1: Bangalore Mangalore Road

At Bangalore Rate(INR) Unit in INR

No.of days 2.0

Stuffing Charges TEU 0

Lift on to Trucks TEU 0

Road Transport from Bangalore Mangalore 200 17567 TEU 3513375

3513375

Stage 2: Mangalore Vizhinjam Sea

Preberthing time (No. of Days) at Mangalore 0.0

Bunkers before berthing - HFHSD 0 25513 TEU 0

on berthing at Mangalore

No. of Days 2.0

Berth Hire Charges 2887 0.66 per GRT/shift 11433

Pilotage 2887 9.87 per GRT 28495

Port Dues 2887 3.13 per GRT 9036

Bunkers at berth - HFHSD 3 25513 TEU 76539

Stevedoring 200 4000 TEU 800000

Wharfage# 200 TEU 0

Misc.& Incidental LS 20000 945503

# Included in Stevedoring

Steaming time from Mangalore Vizhinjam

No. of Days 3.9

At sea - Bunkers - HFHSD 21.5 25513 per MT 548131

548131

At Vizhinjam

Preberthing time (No. of Days) at Vizhinjam 0.5

Bunkers before berthing - HFHSD 0.75 25513 per MT 19135

on berthing at Vizhinjam

No. of Days 2.5

Berth Hire Charges 2887 500 per Day 1250

Channel fee 2887 80 per Day 200

Port Dues 2887 1.00 per GRT 2887

Bunkers at berth - HFHSD 3.75 25513 TEU 95674

Stevedoring 200 3000 TEU 600000

Entry fee for Lorries 200 30 per Lorry 6000

Miscellaneous L.S 15000 740146

2233779

Stage 3: Vizhinjam TVM Road

No. of Days 3

Road Transport from Vizhinjam TVM 200 1100 Per TEU 220000

Lift off from Trucks 200 Per TEU 0

Destuffing Charges at Destination 200 Per TEU 0

220000

Stage 4: Vizhinjam Mangalore Sea on Ballast

No. of Days 3.5

Steaming time from Vizhinjam Mangalore

At sea - Bunkers - HFHSD 19.3 25513 per MT 493318

493318

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: Bangalore Mangalore Road 3513375 0.0

Stage 2: Mangalore Vizhinjam Sea 2233779 8.9

Stage 3: Vizhinjam TVM Road 220000 0.0

Stage 4: Vizhinjam Mangalore Sea 493318 3.5

Total 6460472 12.4

Charter Hire 1350000

No.of standing days: 12.4 Grand Total 7810472

per day Charter Hire: 135000

Transportation Cost in Rs. per TEU 39052

Transportation Cost in Rs. per TKM 1.23

Distance from Bangalore TVM 753 KM

Rate(INR) Unit in INR

No.of days 2.0

Road Transport from Bangalore TVM 200 27955 TEU 5591025

5591025

Road + Sea Road Difference

Transportation Cost in Rs. per TEU 39052 27955 -11097

Transportation Cost in Rs. per TEUKM 22.23 37.13

Bangalore to Mangalore by Road Mangalore to Vizhinjam by Sea Vizhinjam to Thiruvananthapuram by Road

Cost Heads %

Land Movement from Bangalore Mangalore 3513375

Land Movement from Vizhinjam TVM 220000 3733375 47.8

Handling at Ports 1400000 1400000 17.9

Berth Hire+ Port dues+ Pilotage+ Wharfage 59301 59301 0.8

Bunkers at Ports & at Sea 1232796 1232796.13 15.8

Charter Hire 1350000 1350000 17.3

Misc. 35000 35000 0.4

Rs. 7810472 7810472 100

7810472 5591025

Difference -2219447

Sea Transport costs Amount % age

Handling at Ports 1400000 34

Berth Hire+ Port dues+ Pilotage+ Wharfage 59300.52 1

Bunkers at Ports & at Sea 1232796.13 30

Charter Hire 1350000 33

Misc. 35000 1

4077096.65 100

Standing costs

Crew Running Insurance Dry dock Total % age

1413 945 538 154 3050

1413 665 538 154 2770 9.2

Comparison of Transport costs by different modes

ABSTRACT

Bangalore to Thiruvananthapuram by Road

TATA Consultancy Services

General Container Mumbai to Kolkata by Sea

From To Mode NM KM Time (Days)

Stage 1:

Stage 2: Mumbai Kolkata Sea 2119 3927 11.0

Stage 3:

Stage 4: Kolkata Mumbai Sea 2119 3927 9.9

Total (KM) 3927

Vessel details

DWT: 4442

GRT: 2887

Speed: 8 NMPH

Bunkers (HFHSD) @ Sea per day 5.5 MT 27914 @Mumbai

MT 27914

Bunkers (HFHSD) @ Port per day 1.5 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 200 TEU 3600 T

Charter Hire in INR 135000 per day

Stage 1: 0 0 0

At 0 Rate(INR) Unit in INR

No.of days

Stuffing Charges TEU 0

Lift on to Trucks TEU 0

Road Transport from 0 0 200 2000 TEU 400000

400000

Stage 2: Mumbai Kolkata Sea

Preberthing time (No. of Days) at Mumbai 0.0

Bunkers before berthing - HFHSD 0 27914 TEU 0

on berthing at Mumbai

No. of Days 2.0

Berth Hire Charges 2887 0.75 per GRT/shift 12992

Pilotage 2887 3.85 per GRT 11115

Port Dues 2887 1.10 per GRT 3176

Bunkers at berth - HFHSD 3 27914 TEU 83742

Stevedoring 200 5500 TEU 1100000

Wharfage# 200 TEU 0

Misc.& Incidental LS 20000 1231024

# Included in stevedoring

Steaming time from Mumbai Kolkata

No. of Days 11.0

At sea - Bunkers - HFHSD 60.7 27914 per MT 1694394

1694394

At Kolkata

Preberthing time (No. of Days) at Kolkata 0.5

Bunkers before berthing - HFHSD 0.75 27914 per MT 20936

on berthing at Kolkata

No. of Days 2.0

Berth Hire Charges 2887 1.31 per GRT 22692

Pilotage 2887 40 per GRT 115480

Port Dues 2887 5.80 per GRT 16745

Bunkers at berth - HFHSD 3 27914 TEU 83742

Stevedoring 200 5500 TEU 1100000

Wharfage# 200 TEU 0

Misc.& Incidental L.S 30000 1389594

# Included in stevedoring 4315012

Stage 3: 0 0 0

No. of Days

Road Transport from 0 0 200 2000 Per TEU 400000

Lift off from Trucks 200 Per TEU 0

Destuffing Charges at Destination 200 Per TEU 0

400000

Stage 4: Kolkata Mumbai Sea on Ballast

No. of Days 9.9

Steaming time from Kolkata Mumbai

At sea - Bunkers - HFHSD 54.6 27914 per MT 1524955

1524955

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: 0 0 0 400000 0.0

Stage 2: Mumbai Kolkata Sea 4315012 15.5

Stage 3: 0 0 0 400000 0.0

Stage 4: Kolkata Mumbai Sea 1524955 9.9

Total 6639967 25.5

Charter Hire 3438352

No.of standing days: 25.5 Grand Total 10078319

per day Charter Hire: 135000

Transportation Cost in Rs. per TEU 50392

Transportation Cost in Rs. per TKM 0.71

Distance from Mumbai 0 1987 KM

At 0 Rate(INR) Unit in INR

No.of days 2.0

Road Transport from Mumbai Kolkata 200 60355 TEU 12071025

12071025

Road + Sea Road Difference

Transportation Cost in Rs. per TEU 50392 60355 9964

Transportation Cost in Rs. per TEUKM 12.83 30.38

Mumbai to Kolkata by Sea

Cost Heads %

Land Movement from 0 0 400000

Land Movement from 0 0 400000 800000 7.9

Handling at Ports 2200000 2200000 21.8

Berth Hire+ Port dues+ Pilotage+ Wharfage 182199 182199 1.8

Bunkers at Ports & at Sea 3407769 3407768.74 33.8

Charter Hire 3438352 3438351.56 34.1

Misc. 50000 50000 0.5

Rs. 10078319 10078319 100

10078319 12071025

Difference 1992706

Sea Transport costs Amount % age

Handling at Ports 2200000 24

Berth Hire+ Port dues+ Pilotage+ Wharfage 182198.57 2

Bunkers at Ports & at Sea 3407768.74 37

Charter Hire 3438351.56 37

Misc. 50000 1

9278318.88 100

Standing costs

Crew Running Insurance Dry dock Total % age

1413 945 538 154 3050

1413 665 538 154 2770 9.2

Comparison of Transport costs by different modes

ABSTRACT

Mumbai to Kolkata by Road

TATA Consultancy Services

General Container Mumbai to Chennai by Sea

From To Mode NM KM Time (Days)

Stage 1:

Stage 2: Mumbai Chennai Sea 1469 2722 7.7

Stage 3:

Stage 4: Chennai Mumbai Sea 1469 2722 6.9

Total (KM) 2722

Vessel details

DWT: 4442

GRT: 2887

Speed: 8 NMPH

Bunkers (HFHSD) @ Sea per day 5.5 MT 27914 @Mumbai

MT 27914

Bunkers (HFHSD) @ Port per day 1.5 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 200 TEU 3600 T

Charter Hire in INR 135000 per day

Stage 1: 0 0 0

At 0 Rate(INR) Unit in INR

No.of days

Stuffing Charges TEU 0

Lift on to Trucks TEU 0

Road Transport from 0 0 200 2000 TEU 400000

400000

Stage 2: Mumbai Chennai Sea

Preberthing time (No. of Days) at Mumbai 0.0

Bunkers before berthing - HFHSD 0 27914 TEU 0

on berthing at Mumbai

No. of Days 2.0

Berth Hire Charges 2887 0.75 per GRT/shift 12992

Pilotage 2887 3.85 per GRT 11115

Port Dues 2887 1.10 per GRT 3176

Bunkers at berth - HFHSD 3 27914 TEU 83742

Stevedoring 200 5500 TEU 1100000

Wharfage# 200 TEU 0

Misc.& Incidental LS 20000 1231024

# Included in Stevedoring

Steaming time from Mumbai Chennai

No. of Days 7.7

At sea - Bunkers - HFHSD 42.1 27914 per MT 1174641

1174641

At Chennai

Preberthing time (No. of Days) at Chennai 0.5

Bunkers before berthing - HFHSD 0.75 27914 per MT 20936

on berthing at Chennai

No. of Days 2.0

Berth Hire Charges 2887 3010.00 per day 18060

Pilotage 2887 4.99 per GRT 14406

Port Dues 2887 2.05 per GRT 5918

Bunkers at berth - HFHSD 3 27914 TEU 83742

Stevedoring 200 5000 TEU 1000000

Wharfage# 200 TEU 0

Misc.& Incidental L.S 30000 1173062

# Included in Stevedoring 3578728

Stage 3: 0 0 0

No. of Days

Road Transport from 0 0 200 2000 Per TEU 400000

Lift off from Trucks 200 Per TEU 0

Destuffing Charges at Destination 200 Per TEU 0

400000

Stage 4: Chennai Mumbai Sea on Ballast

No. of Days 6.9

Steaming time from Chennai Mumbai

At sea - Bunkers - HFHSD 37.9 27914 per MT 1057177

1057177

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: 0 0 0 400000 0.0

Stage 2: Mumbai Chennai Sea 3578728 12.2

Stage 3: 0 0 0 400000 0.0

Stage 4: Chennai Mumbai Sea 1057177 6.9

Total 5435905 19.0

Charter Hire 2569992

No.of standing days: 19.0 Grand Total 8005897

per day Charter Hire: 135000

Transportation Cost in Rs. per TEU 40029

Transportation Cost in Rs. per TKM 0.82

Distance from Mumbai 0 1329 KM

At 0 Rate(INR) Unit in INR

No.of days 2.0

Road Transport from Mumbai Chennai 200 44854 TEU 8970750

8970750

Road + Sea Road Difference

Transportation Cost in Rs. per TEU 40029 44854 4824

Transportation Cost in Rs. per TEUKM 14.71 33.75

Mumbai to Chennai by Sea

Cost Heads %

Land Movement from 0 0 400000

Land Movement from 0 0 400000 800000 10.0

Handling at Ports 2100000 2100000 26.2

Berth Hire+ Port dues+ Pilotage+ Wharfage 65667 65667 0.8

Bunkers at Ports & at Sea 2420238 2420238.3 30.2

Charter Hire 2569992 2569992.19 32.1

Misc. 50000 50000 0.6

Rs. 8005897 8005897 100

8005897 8970750

Difference 964853

Sea Transport costs Amount % age

Handling at Ports 2100000 29

Berth Hire+ Port dues+ Pilotage+ Wharfage 65666.63 1

Bunkers at Ports & at Sea 2420238.3 34

Charter Hire 2569992.19 36

Misc. 50000 1

7205897.12 100

Standing costs

Crew Running Insurance Dry dock Total % age

1413 945 538 154 3050

1413 665 538 154 2770 9.2

Comparison of Transport costs by different modes

ABSTRACT

Mumbai to Chennai by Road

TATA Consultancy Services

General Container Jamshedpur to Kolkata by Road Kolkata to Chennai by Sea Chennai to Bangalore by Road

From To Mode NM KM Time (Days)

Stage 1: Jamshedpur Kolkata Road 295 2.5

Stage 2: Kokata Chennai Sea 785 1455 4.1

Stage 3: Chennai Bangalore Road 360 3.0

Stage 4: Chennai Kolkata Sea 785 1455 3.7

Total (KM) 2110

Vessel details

DWT: 4442

GRT: 2887

Speed: 8 NMPH

Bunkers (HFHSD) @ Sea per day 5.5 MT 22582 @Kolkata

MT 22582

Bunkers (HFHSD) @ Port per day 1.5 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 200 TEU 3600 T

Charter Hire in INR 135000 per day

Stage 1: Jamshedpur Kolkata Road

At Jamshedpur Rate(INR) Unit in INR

No.of days 2.5

Stuffing Charges TEU 0

Lift on to Trucks TEU 0

Road Transport from Jamshedpur Kolkata 200 19913 TEU 3982500

3982500

Stage 2: Kokata Chennai Sea

Preberthing time (No. of Days) at Kokata 0.0

Bunkers before berthing - HFHSD 0 22582 TEU 0

on berthing at Kokata

No. of Days 2.0

Berth Hire Charges 2887 1.31 per GRT/shift 22692

Pilotage 2887 40 per GRT 115480

Port Dues 2887 5.80 per GRT 16745

Bunkers at berth - HFHSD 3 22582 TEU 67746

Stevedoring 200 5500 TEU 1100000

Wharfage # 200 TEU 0

Misc.& Incidental LS 20000 1342662

# Included in Stevedoring

Steaming time from Kokata Chennai

No. of Days 4.1

At sea - Bunkers - HFHSD 22.5 22582 per MT 507801

507801

At Chennai

Preberthing time (No. of Days) at Chennai 0.5

Bunkers before berthing - HFHSD 0.75 22582 per MT 16937

on berthing at Chennai

No. of Days 2.0

Berth Hire Charges 2887 3010.00 per day 18060

Pilotage 2887 4.99 per GRT 14406

Port Dues 2887 2.05 per GRT 5918

Bunkers at berth - HFHSD 3 22582 TEU 67746

Stevedoring 200 5000 TEU 1000000

Wharfage # 200 TEU 0

Misc.& Incidental L.S 30000 1153067

# Included in Stevedoring 3003530

Stage 3: Chennai Bangalore Road

No. of Days 3.0

Road Transport from Chennai Bangalore 200 18255 Per TEU 3651000

Lift off from Trucks 200 Per TEU 0

Destuffing Charges at Destination 200 Per TEU 0

3651000

Stage 4: Chennai Kolkata Sea on Ballast

No. of Days 3.7

Steaming time from Chennai Kolkata

At sea - Bunkers - HFHSD 20.2 22582 per MT 457021

457021

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: Jamshedpur Kolkata Road 3982500 2.5

Stage 2: Kokata Chennai Sea 3003530 8.6

Stage 3: Chennai Bangalore Road 3651000 3.0

Stage 4: Chennai Kolkata Sea 457021 3.7

Total 11094051 17.8

Charter Hire 1656211

No.of standing days: 12.3 Grand Total 12750262

per day Charter Hire: 135000

Transportation Cost in Rs. per TEU 63751

Transportation Cost in Rs. per TKM 1.68

Distance from Jamshedpur Bangalore 1834 KM

At Jamshedpur Rate(INR) Unit in INR

No.of days 2.0

Road Transport from Jamshedpur Bangalore 200 55708 TEU 11141550

11141550

Road + Sea Road Difference

Transportation Cost in Rs. per TEU 63751 55708 -8044

Transportation Cost in Rs. per TEUKM 30.22 30.38

Jamshedpur to Kolkata by Road Kolkata to Chennai by Sea Chennai to Bangalore by Road

Cost Heads %

Land Movement from Jamshedpur Kolkata 3982500

Land Movement from Chennai Bangalore 3651000 7633500 59.9

Handling at Ports 2100000 2100000 16.5

Berth Hire+ Port dues+ Pilotage+ Wharfage 193301 193301 1.5

Bunkers at Ports & at Sea 1117250 1117250.33 8.8

Charter Hire 1656211 1656210.94 13.0

Misc. 50000 50000 0.4

Rs. 12750262 12750262 100

12750262 11141550

Difference -1608712

Sea Transport costs Amount % age

Handling at Ports 2100000 41

Berth Hire+ Port dues+ Pilotage+ Wharfage 193300.9 4

Bunkers at Ports & at Sea 1117250.33 22

Charter Hire 1656210.94 32

Misc. 50000 1

5116762.17 100

Standing costs

Crew Running Insurance Dry dock Total % age

1413 945 538 154 3050

1413 665 538 154 2770 9.2

Comparison of Transport costs by different modes

ABSTRACT

Jamshedpur to Bangalore by Road

TATA Consultancy Services

General Container Jamnagar to Sikka by Road Sikka to Mumbai by Sea

From To Mode NM KM Time (Days)

Stage 1: Jamnagar Sikka 30 1.5

Stage 2: Sikka Mumbai Sea 418 775 2.2

Stage 3:

Stage 4: Mumbai Sikka Sea 418 775 2.0

Total (KM) 805

Vessel details

DWT: 4442

GRT: 2887

Speed: 8 NMPH

Bunkers (HFHSD) @ Sea per day 5.5 MT 27914 @Mumbai

MT 27914

Bunkers (HFHSD) @ Port per day 1.5 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 200 TEU 3600 T

Charter Hire in INR 135000 per day

Stage 1: Jamnagar Sikka 0

At Jamnagar Rate(INR) Unit in INR

No.of days 1.5

Stuffing Charges TEU 0

Lift on to Trucks TEU 0

Road Transport from Jamnagar Sikka 200 2000 TEU 400000

400000

Stage 2: Sikka Mumbai Sea

Preberthing time (No. of Days) at Sikka 0.0

Bunkers before berthing - HFHSD 0 27914 TEU 0

on berthing at Sikka

No. of Days 2.0

Berth Hire Charges 2887 1.00 per GRT/shift 17322

Pilotage 2887 per GRT 0

Port Dues 2887 6.00 per GRT 17322

Bunkers at berth - HFHSD 3 27914 TEU 83742

Stevedoring 200 3000 TEU 600000

Wharfage # 200 TEU 0

Misc.& Incidental LS 10000 728386

# Included in Stevedoring

Steaming time from Sikka Mumbai

No. of Days 2.2

At sea - Bunkers - HFHSD 12.0 27914 per MT 334241

334241

At Mumbai

Preberthing time (No. of Days) at Mumbai 0.5

Bunkers before berthing - HFHSD 0.75 27914 per MT 20936

on berthing at Mumbai

No. of Days 2.0

Berth Hire Charges 2887 0.75 per GRT 12992

Pilotage 2887 3.85 per GRT 11115

Port Dues 2887 1.10 per GRT 3176

Bunkers at berth - HFHSD 3 27914 TEU 83742

Stevedoring 200 5500 TEU 1100000

Wharfage # 200 TEU 0

Misc.& Incidental L.S 20000 1251960

# Included in Stevedoring 2314587

Stage 3: 0 0 0

No. of Days

Road Transport from 0 0 200 2000 Per TEU 400000

Lift off from Trucks 200 Per TEU 0

Destuffing Charges at Destination 200 Per TEU 0

400000

Stage 4: Mumbai Sikka Sea on Ballast

No. of Days 2.0

Steaming time from Mumbai Sikka

At sea - Bunkers - HFHSD 10.8 27914 per MT 300817

300817

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: Jamnagar Sikka 0 400000 1.5

Stage 2: Sikka Mumbai Sea 2314587 6.7

Stage 3: 0 0 0 400000 0.0

Stage 4: Mumbai Sikka Sea 300817 2.0

Total 3415404 10.1

Charter Hire 1165922

No.of standing days: 8.6 Grand Total 4581326

per day Charter Hire: 135000

Transportation Cost in Rs. per TEU 22907

Transportation Cost in Rs. per TKM 1.58

Distance from Sikka 0 847 KM

At Jamnagar Rate(INR) Unit in INR

No.of days 3.0

Road Transport from Sikka Mumbai 200 31445 TEU 6289000

6289000

Road + Sea Road Difference

Transportation Cost in Rs. per TEU 22907 31445 8538

Transportation Cost in Rs. per TEUKM 28.47 37.13

Jamnagar to Sikka by Road Sikka to Mumbai by Sea

Cost Heads %

Land Movement from Jamnagar Sikka 400000

Land Movement from Mumbai Mumbai 400000 800000 17.5

Handling at Ports 1700000 1700000 37.1

Berth Hire+ Port dues+ Pilotage+ Wharfage 61926 61926 1.4

Bunkers at Ports & at Sea 823478 823477.5385 18.0

Charter Hire 1165922 1165921.875 25.4

Misc. 30000 30000 0.7

Rs. 4581326 4581326 100

4581326 6289000

Difference 1707674

Sea Transport costs Amount % age

Handling at Ports 1700000 45

Berth Hire+ Port dues+ Pilotage+ Wharfage 61926.15 2

Bunkers at Ports & at Sea 823477.5385 22

Charter Hire 1165921.875 31

Misc. 30000 1

3781325.564 100

Standing costs

Crew Running Insurance Dry dock Total % age

1413 945 538 154 3050

1413 665 538 154 2770 9.2

Comparison of Transport costs by different modes

ABSTRACT

Jamnagar to Mumbai by Road

TATA Consultancy Services

General Cargo- Container Tuticorin to Kollam by Sea

No. of Stages 3

From To Mode NM KM Time (Days)

Stage 1:

Stage 2: Tuticorin Kollam Sea 191 354 1.0

Stage 3:

Stage 4: Kollam Tuticorin Sea 191 354 0.9

Total (KM) 354

Vessel details

DWT: 4442

GRT: 2887

Draft: 4 metres

Speed: 8 NMPH

Bunkers (HFHSD) @ Sea per day 5.5 MT 25899 @Tuticorin

MT 25899

Bunkers (HFHSD) @ Port per day 1.5 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 200 TEU 3600 T

Charter Hire in INR 135000 per day

Stage 1: 0 0 0

At 0 Rate(INR) Unit in INR

No.of days 2.0

Stuffing Charges TEU 0

Lift on to Trucks TEU 0

Road Transport from 0 0 200 TEU 00

Stage 2: Tuticorin Kollam Sea

Preberthing time (No. of Days) at Tuticorin 0.0

Bunkers before berthing - HFHSD 0 25899 TEU 0

on berthing at Tuticorin

No. of Days 2.0

Berth Hire Charges 2887 0.48 per GRT/shift 8315

Pilotage 2887 4.55 per GRT 13136

Port Dues 2887 2.35 per GRT 6784

Bunkers at berth - HFHSD 3 25899 TEU 77697

Stevedoring 200 4500 TEU 900000

Wharfage# 200 TEU 0

Misc.& Incidental LS 20000 1025932

# Included in Stevedoring

Steaming time from Tuticorin Kollam

No. of Days 1.0

At sea - Bunkers - HFHSD 5.5 25899 per MT 141703

141703

At Kollam

Preberthing time (No. of Days) at Kollam 0.5

Bunkers before berthing - HFHSD 0.75 25899 per MT 19424

on berthing at Kollam

No. of Days 3.0

Berth Hire Charges 2887 500 per day 1500

Channel fee 2887 80 per day 240

Port Dues 2887 1.00 per GRT 2887

Bunkers at berth - HFHSD 4.5 25899 TEU 116545.5

Stevedoring 200 3000 TEU 600000

Entry fee for Lorries 200 30 per Lorry 6000

Misc.& Incidental L.S 15000 761597

1929231

Stage 3: 0 0 0

No. of Days 3

Road Transport from 0 0 200 Per TEU 0

Lift off from Trucks 200 Per TEU 0

Destuffing Charges at Destination 200 Per TEU 0

0

Stage 4: Kollam Tuticorin Sea on Ballast

No. of Days 0.9

Steaming time from Kollam Tuticorin

At sea - Bunkers - HFHSD 4.9 25899 per MT 127532

127532

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: 0 0 0 0 0.0

Stage 2: Tuticorin Kollam Sea 1929231 6.5

Stage 3: 0 0 0 0 0.0

Stage 4: Kollam Tuticorin Sea 127532 0.9

Total 2056764 7.4

Charter Hire 1350000

No.of standing days: 7.4 Grand Total 3406764

per day Charter Hire: 135000

Transportation Cost in Rs. per TEU 17034

Transportation Cost in Rs. per TKM 2.67

Distance from Tuticorin 0 281 KM

At 0 Rate(INR) Unit in INR

No.of days 2.0

Road Transport from Tuticorin Kollam 200 18968 TEU 3793500

3793500

Road + Sea Road Difference

Transportation Cost in Rs. per TEU 17034 18968 1934

Transportation Cost in Rs. per TEUKM 48.13 67.50

Tuticorin to Kollam by Sea

Cost Heads %

Land Movement from 0 0 0

Land Movement from 0 0 0 0 0.0

Handling at Ports 1500000 1500000 44.0

Berth Hire+ Port dues+ Pilotage+ Wharfage 38862 38862 1.1

Bunkers at Ports & at Sea 482902 482901.693 14.2

Charter Hire 1350000 1350000 39.6

Misc. 35000 35000 1.0

Rs. 3406764 3406764 100

3406764 3793500

Difference 386736

Sea Transport costs Amount % age

Handling at Ports 1500000 44

Berth Hire+ Port dues+ Pilotage+ Wharfage 38861.86 1

Bunkers at Ports & at Sea 482901.693 14

Charter Hire 1350000 40

Misc. 35000 1

3406763.55 100

Standing costs

Crew Running Insurance Dry dock Total % age

1413 945 538 154 3050

1413 665 538 154 2770 9.2

Comparison of Transport costs by different modes

ABSTRACT

Tuticorin to Kollam by Road

TATA Consultancy Services

General Container Mangalore to Kandla by Sea - Kandla to Udaipur by Road

From To Mode NM KM Time (Days)

Stage 1: Mangalore Road

Stage 2: Mangalore Kandla Sea 776 1438 4.0

Stage 3: Kandla Udaipur Road 360 3.0

Stage 4: Kandla Mangalore Sea 776 1438 3.6

Total (KM) 1798

Vessel details

DWT: 4442

GRT: 2887

Speed: 8 NMPH

Bunkers (HFHSD) @ Sea per day 5.5 MT 25513 @Mangalore

MT 25513

Bunkers (HFHSD) @ Port per day 1.5 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 200 TEU 3600 T

Charter Hire in INR 135000 per day

Stage 1: 0 Mangalore Road

At 0 Rate(INR) Unit in INR

No.of days 2.0

Stuffing Charges TEU 0

Lift on to Trucks TEU 0

Road Transport from 0 Mangalore 200 500 TEU 100000

100000

Mailto:kris@dgshipping.com