ANNEXURE - A3

Location Map of Industries

ANNEXURE - A4

Economics of Coastal Shipping

Comparison with Rail Transport

Commodity Origin Destination Quantity

(million tonnes)

Coal Talcher Kottayam 0.09

POL Bajva Bangalore 0.18

Food Grains Kakinada Quilon 0.39

Iron & Steel Vishakhapatnam Tondiarpet 0.15

Vishakhapatnam Shalimar 0.14

Vishakhapatnam Haldia Dock 0.02

Other cargo Cuddalore Shalimar 0.05

Kakinada port Shalimar 0.04

Mithapur-Tatachem Coimbatore 0.02

Mettupalayam Shalimar 0.02

1.1 Total

Divertable Traffic from Rail

Economics of Coastal Shipping with Respect to Rail Movement – Case Studies

Rail Rail + Sea

Distance Cost/Tonnes Distance Cost/Tonnes

Origin Destination Commodity Parcel Size

(MT)

kms Rs kms Rs

Viability

By Sea

Tughlakabad Whitefields Container 350 TEUs 2500 25000 2944 35865 Unviable

Vizag Steel Plant Tondiarpet Sponge Iron 2700 784 699 670 1052 Unviable

Vizag Steel Plant Tondiarpet Pig Iron 16000 784 741 670 769 Unviable

Talcher Kottayam Coal 30000 1900 1342 2792 1139 Viable

Kakinada Palghat Food Grains 6000 1250 657 2222 1006 Unviable

Tughlakabad Tondiarpet Food Grains 16000 2200 1013 4144 1185 Unviable

Kakinada Kollam Rice 6000 1500 1079 1990 1057 Viable

Muldwarka Kollam Cement 8520 2500 1631 1830 1189 Viable

Bajva Bangalore POL 28000 1420 1949 2034 1610 Viable

Vizag Steel Plant Tondiarpet Sheets & Coils 16000 784 833 670 802 Viable

* MT = Metric Tonnes

Tughlakabad ICD to Kandla by Rail - Kandla to Cochin by Sea - Cochin to Whitefield by Rail

Containers - General Cargo

From To Mode NM KM Time (Days)

Stage 1: Tughlakabad Kandla Rail 700 3.0

Stage 2: Kandla Cochin Sea 968 1794 2.9

Stage 3: Cochin Whitefield Rail 450 2.0

Stage 4: Cochin Kandla Sea 968 1794 2.6

Total (KM) 2944

Vessel details

DWT: 8700

GRT: 6365

Speed: 14 NMPH

Bunkers (IFO) @ Sea per day 12.5 MT 14724 @Kandla

Bunkers (MDO) @ Sea per day 1 MT 20098 do

Bunkers (MDO) @ Port per day 2 MT

Nature of Cargo General

Type of Vessel Container

Parcel Size 350 TEU 6300 T

Charter Hire in INR 211500 per day

Stage 1: Tughlakabad Kandla Rail

At Tughlakabad Rate(INR) Unit in INR

No.of days 3.0

Stuffing Charges 2200 TEU 0

Lift on to Trucks 400 TEU 0

Rail Transport from Tughlakabad Kandla 350 11400 TEU 3990000

3990000

Stage 2: Kandla Cochin Sea

Preberthing time (No. of Days) at Kandla 0.0

Bunkers before berthing - MDO 0 20098 TEU 0

on berthing at Kandla

No. of Days 2.0

Berth Hire Charges 6365 0.57 per GRT/shift 21768

Pilotage 6365 13.3 per GRT 84655

Port Dues 6365 4.5 per GRT 28643

Bunkers at berth - MDO 4 20098 TEU 80392

Stevedoring 350 4000 TEU 1400000

Wharfage # 350 TEU 0

Misc.& Incidental LS 20000 1635457

# included in the stevedoring cost

Steaming time from Kandla Cochin

No. of Days 2.9

At sea - Bunkers - IFO 36.0 14724 per MT 530239

At sea - Bunkers - MDO 2.9 20098 per MT 57901 588141

At Cochin

Preberthing time (No. of Days) at Cochin 0.5

Bunkers before berthing - MDO 0.5 20098 per MT 10049

on berthing at Cochin

No. of Days 2.0

Berth Hire Charges 6365 0.25 per GRT 9548

Pilotage 6365 8.05 per GRT 51238

Port Dues 6365 2.15 per GRT 13685

Bunkers at berth - MDO 4 20098 TEU 80392

Stevedoring 350 4500 TEU 1575000

Wharfage # 350 TEU 0

Misc.& Incidental L.S 30000 1769912

# included in the stevedoring cost 3993509

Stage 3: Cochin Whitefield Rail

No. of Days 3

Rail Transport from Cochin Whitefield 350 5500 Per TEU 1925000

Lift off from Trucks 350 Per TEU 0

Destuffing Charges at Destination 350 Per TEU 0

1925000

Stage 4: Cochin Kandla Sea on Ballast

No. of Days 2.6

Steaming time from Cochin Kandla

At sea - Bunkers - IFO 32.4 14724 per MT 477215

At sea - Bunkers - MDO 2.6 20098 per MT 52111

529327

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: Tughlakabad Kandla Rail 3990000 3.0

Stage 2: Kandla Cochin Sea 3993509 7.4

Stage 3: Cochin Whitefield Rail 1925000 2.0

Stage 4: Cochin Kandla Sea 529327 2.6

Total 10437836 15.0

Charter Hire 2115000

No.of standing days: 10.0 Grand Total 12552836

per day Charter Hire: 211500

Transportation Cost in Rs. per TEU 35865

Transportation Cost in Rs. per TKM 0.68

Distance from Tughlakabad Whitefield 2500 KM

At Tughlakabad Rate(INR) * Unit in INR

No.of days 10.0

Rail Transport from Tughlakabad Whitefield 350 25000.00 TEU 8750000

8750000

* empty return not included

Rail + Sea Rail Difference

Transportation Cost in Rs. per TEU 35865 25000 -10865

Transportation Cost in Rs. per TEUKM 12.18 10.00

Tughlakabad ICD to Kandla by Rail - Kandla to Cochin by Sea - Cochin to Whitefield by Rail

Cost Heads %

Land Movement from Tughlakabad Kandla 3990000

Land Movement from Cochin Whitefield 1925000 5915000 47.1

Handling at Ports 2975000 2975000 23.7 297500

Berth Hire+ Port dues+ Pilotage+ Wharfage 209536 209536 1.7 62860.74

Bunkers at Ports & at Sea 1288300 1288300.267 10.3 347841.1

Charter Hire 2115000 2115000 16.8

Misc. 50000 50000 0.4

Rs. 12552836 12552836 100 708201.8

11844634 8750000

Difference -3094634 -8841.812

Sea Transport costs Amount % age

Handling at Ports 2975000 45

Berth Hire+ Port dues+ Pilotage+ Wharfage 209535.8 3

Bunkers at Ports & at Sea 1288300.267 19

Charter Hire 2115000 32 28.9356

Misc. 50000 1

6637836.067 100 6443533 2.93

Tughlakabad to Whitefield by Rail

Comparison of Transport costs by different modes

ABSTRACT

TATA Consultancy Services

Vishakapatnam Steel Plant to VSP Port by Rail - VSP Port to Chennai by Sea- Chennai to Tondiarpet by Rail

Sponge Iron

From To Mode NM KM Time (Days)

Stage 1: VSP Plant VSP Port Rail 30 1.0

Stage 2: VSP Port Chennai Sea 339 628 1.4

Stage 3: Chennai Tondiarpet Rail 12 1.0

Stage 4: Chennai VSP Port Sea 339 628 1.3

Total (KM) 670

Vessel details

DWT: 2873

GRT: 1874

Speed: 10 NMPH

Bunkers (HFHSD) @ Sea per day 5 MT 24275 @Vizag

Bunkers (HFHSD) @ Port per day 0.5 MT 24275 do

Nature of Cargo Sponge Iron

Type of Vessel General Cargo

Parcel Size 2700 MT

Charter Hire in INR 90000 per day

Stage 1: VSP Plant VSP Port Rail

At VSP Plant Rate(INR) Unit in INR

No.of days 1.0

Stuffing Charges 0 MT 0

Lift on to Trucks 0 MT 0

Rail Transport from VSP Plant VSP Port 2700 120.9 MT 326430

326430

Stage 2: VSP Port Chennai Sea

Preberthing time (No. of Days) at VSP Port 0

Bunkers before berthing - HFHSD 0 24275 MT 0

on berthing at VSP Port

No. of Days 2.5

Berth Hire Charges 1874 1.9 per GRT/shift 26705

Pilotage 1874 11.39 per GRT 21345

Port Dues 1874 7.91 per GRT 14823

Bunkers at berth - HFHSD 1.25 24275 MT 30344

Stevedoring 2700 130 MT 351000

Wharfage 2700 35 MT 94500

Misc.& Incidental LS 15000 553716

Steaming time from VSP Port Chennai

No. of Days 1.4

At sea - Bunkers - HFHSD 7.1 24275 per MT 171442

171442

At Chennai

Preberthing time (No. of Days) at Chennai 0.5

Bunkers before berthing - HFHSD 0.25 24275 per MT 6069

on berthing at Chennai

No. of Days 2.5

Berth Hire Charges 1874 3828.30 per Shift 28712

Pilotage 1874 4.99 per GRT 9351

Port Dues 1874 2.05 per GRT 3842

Bunkers at berth - HFHSD 1.25 24275 MT 30344

Stevedoring 2700 180 MT 486000

Wharfage 2700 39 MT 105300

Misc.& Incidental L.S 25000 694618

1419776

Stage 3: Chennai Tondiarpet Rail

No. of Days 1

Rail Transport from Chennai Tondiarpet 2700 75.1 MT 202770

Lift off from Trucks 2700 MT 0

Destuffing Charges at Destination 2700 MT 0

202770

Stage 4: Chennai VSP Port Sea on Ballast

No. of Days 1.3

Steaming time from Chennai VSP Port

At sea - Bunkers - HFHSD 6.4 24275 per MT 154298

154298

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: VSP Plant VSP Port Rail 326430 1.0

Stage 2: VSP Port Chennai Sea 1419776 6.9

Stage 3: Chennai Tondiarpet Rail 202770 1.0

Stage 4: Chennai VSP Port Sea 154298 1.3

Total 2103274 10.2

Charter Hire 736538

No.of standing days: 8.2 Grand Total 2839812

per day Charter Hire: 90000

Transportation Cost in Rs. per MT 1052

Transportation Cost in Rs. per MTKM 1.57

Distance from VSP Plant Tondiarpet 784 KM

At VSP Plant Rate(INR) Unit in INR

No.of days 5.0

Rail Transport from VSP Plant Tondiarpet 2700 699.20 MT 1887840

1887840

Rail + Sea Rail Difference

Transportation Cost in Rs. per MT 1052 699 -353

Transportation Cost in Rs. per MTKM 1.57 0.89

Vishakapatnam Steel Plant to VSP Port by Rail - VSP Port to Chennai by Sea- Chennai to Tondiarpet by Rail

Cost Heads %

Land Movement from VSP Plant VSP Port 326430

Land Movement from Chennai Tondiarpet 202770 529200 18.6

Handling at Ports 837000 837000 29.5 83700

Berth Hire+ Port dues+ Pilotage+ Wharfage 304578 304578 10.7 91373.37

Bunkers at Ports & at Sea 392496 392496 13.8 105974

Charter Hire 736538 736537.5 25.9

Misc. 40000 40000 1.4

Rs. 2839812 2839812 100 281047.4

2558764 1887840

Cost Heads - Sea Segment Difference -670924 -248.491

Handling at Ports 837000 36

Berth Hire+ Port dues+ Pilotage+ Wharfage 304578 13

Bunkers at Ports & at Sea 392496 17

Charter Hire 736538 32

Misc. 40000 2

2310612 100

Comparison of Transport costs by different modes

ABSTRACT

VSP Steel Plant to Tondiarpet

TATA Consultancy Services

Vishakapatnam Steel Plant to VSP Port by Rail - VSP Port to Chennai by Sea- Chennai to Tondiarpet by Rail

From To Mode NM KM Time (Days)

Stage 1: VSP Plant VSP Port Rail 30 2.0

Stage 2: VSP Port Chennai Sea 339 628 1.2

Stage 3: Chennai Tondiarpet Rail 12 1.0

Stage 4: Chennai VSP Port Sea 339 628 1.1

Total (KM) 670

Vessel details

DWT: 16500

GRT: 11025

Speed: 12 NMPH

Bunkers (IFO) @ Sea per day 15 MT 15679 @ Vizag

Bunkers (MDO) @ Sea per day 2.5 MT 22345 do

Bunkers (MDO) @ Port per day 2.5 MT

Nature of Cargo Pig Iron

Type of Vessel General Cargo

Parcel Size 16000 MT

Charter Hire in INR 140000 per day

Stage 1: VSP Plant VSP Port Rail

At VSP Plant Rate(INR) Unit in INR

No.of days 2.0

Stuffing Charges 0 MT 0

Lift on to Trucks 0 MT 0

Rail Transport from VSP Plant VSP Port 16000 133.4 MT 2134400

2134400

Stage 2: VSP Port Chennai Sea

Preberthing time (No. of Days) at VSP Port 0

Bunkers before berthing - MDO 0 22345 MT 0

on berthing at VSP Port

No. of Days 4

Berth Hire Charges 11025 11818.80 per GRT/shift 141826

Pilotage 11025 12.41 per GRT 136820

Port Dues 11025 7.91 per GRT 87208

Bunkers at berth - MDO 10 22345 MT 223450

Stevedoring 16000 100 MT 1600000

Wharfage 16000 35 MT 560000

Misc.& Incidental LS 15000 2764304

Steaming time from VSP Port Chennai

No. of Days 1.2

At sea - Bunkers - IFO 17.7 15679 per MT 276832

At sea - Bunkers - MDO 2.9 22345 per MT 65755

342587

At Chennai

Preberthing time (No. of Days) at Chennai 0.5

Bunkers before berthing - MDO 1.25 22345 per MT 27931

on berthing at Chennai

No. of Days 2.5

Berth Hire Charges 11025 4725 per Shift 35438

Pilotage 11025 4.04 per GRT 44541

Port Dues 11025 2.05 per GRT 22601

Bunkers at berth - MDO 6.25 22345 MT 139656

Stevedoring 16000 150 MT 2400000

Wharfage 16000 39 MT 624000

Misc.& Incidental L.S 25000 3319167

6426058

Stage 3: Chennai Tondiarpet Rail

No. of Days 1

Rail Transport from Chennai Tondiarpet 16000 133.4 MT 2134400

Lift off from Trucks 16000 MT 0

Destuffing Charges at Destination 16000 MT 0

2134400

Stage 4: Chennai VSP Port Sea on Ballast

No. of Days 1.1

Steaming time from Chennai VSP Port

At sea - Bunkers - IFO 15.9 15679 per MT 249149

At sea - Bunkers - MDO 2.6 22345 per MT 59179

308328

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: VSP Plant VSP Port Rail 2134400 2.0

Stage 2: VSP Port Chennai Sea 6426058 8.2

Stage 3: Chennai Tondiarpet Rail 2134400 1.0

Stage 4: Chennai VSP Port Sea 308328 1.1

Total 11003186 12.2

Charter Hire 1293104.17

No.of standing days: 9.2 Grand Total 12296291

per day Charter Hire: 140000

Transportation Cost in Rs. per MT 769

Transportation Cost in Rs. per MTKM 1.15

Distance from VSP 784 KM

At VSP Plant Rate(INR) Unit in INR

No.of days 5.0

Rail Transport from VSP Plant Tondiarpet 16000 740.60 MT 11849600

11849600

Rail + Sea Rail Difference

Transportation Cost in Rs. per MT 769 741 -28

Transportation Cost in Rs. per MTKM 1.15 0.94

Vishakapatnam Steel Plant to VSP Port by Rail - VSP Port to Chennai by Sea- Chennai to Tondiarpet by Rail

Cost Heads %

Land Movement from VSP Plant VSP Port 2134400

Land Movement from Chennai Tondiarpet 2134400 4268800 34.7

Handling at Ports 4000000 4000000 32.5 400000

Berth Hire+ Port dues+ Pilotage+ Wharfage 1652433 1652433.35 13.4 495730

Bunkers at Ports & at Sea 1041953 1041953.107 8.5 281327.3

Charter Hire 1293104 1293104.167 10.5

Misc. 40000 40000 0.3

Rs. 12296291 12296291 100 1177057

11119233 11849600

Difference 730367 45.65

Cost Heads - Sea Segment

Handling at Ports 4000000 50

Berth Hire+ Port dues+ Pilotage+ Wharfage 1652433.35 21

Bunkers at Ports & at Sea 1041953.11 13

Charter Hire 1293104.17 16

Misc. 40000 0

8027490.62 100

Comparison of Transport costs by different modes

ABSTRACT

Vishakapatanam to Chennai by Rail

TATA Consultancy Services

Talcher Coal Mines to Paradip by Rail - Paradip to Cochin by Sea - Cochin to Kottayam by Rail

Thermal Coal

From To Mode NM KM Time (Days)

Stage 1: Talcher Paradip Rail 200 2.0

Stage 2: Paradip Cochin Sea 1372 2542 4.6

Stage 3: Cochin Kottayam Rail 50 2.0

Stage 4: Cochin Paradip Sea 1372 2542 4.1

Total (KM) 2792

Vessel details

DWT: 39989

GRT: 27997

Speed: 12.5 NMPH

Bunkers (IFO) @ Sea per day 25 MT 15092 @Paradip

Bunkers (MDO) @ Sea per day 2 MT 24048 @Paradip

Bunkers (MDO) @ Port per day 3.5 MT

Nature of Cargo Thermal Coal

Type of Vessel Dry Bulk

Parcel Size 30000 MT

Charter Hire in INR 587500 per day

Stage 1: Talcher Paradip Rail

At Talcher Rate(INR) Unit in INR

No.of days 2.0

Rail Transport from Talcher Paradip 30000 183.6 MT 5508000

5508000

Stage 2: Paradip Cochin Sea

Preberthing time (No. of Days) at Paradip 0

Bunkers before berthing - MDO 0 24048 MT 0

on berthing at Paradip

No. of Days 1.5

Berth Hire Charges 27997 1 per GRT/shift 125987

Pilotage 27997 13.5 per GRT 377960

Port Dues 27997 6 per GRT 167982

Bunkers at berth - MDO 5.25 24048 MT 126252

Stevedoring 30000 150 MT 4500000

Wharfage 30000 55 MT 1650000

Misc.& Incidental LS 20000 6968180

Steaming time from Paradip Cochin

No. of Days 4.6

At sea - Bunkers - IFO 114.3 15092 per MT 1725519

At sea - Bunkers - MDO 9.1 24048 per MT 219959 1945478

At Cochin

Preberthing time (No. of Days) at Cochin 1

Bunkers before berthing - MDO 3.5 24048 per MT 84168

on berthing at Cochin

No. of Days 3

Berth Hire Charges 27997 0.25 per GRT 62993

Pilotage 27997 8.05 per GRT 225376

Port Dues 27997 2.15 per GRT 60194

Bunkers at berth - MDO 10.5 24048 MT 252504

Stevedoring 30000 150 MT 4500000

Wharfage 30000 40 MT 1200000

Misc.& Incidental 0 L.S 30000 6415235

15328892

Stage 3: Cochin Kottayam Rail

No. of Days 3

Rail Transport from Cochin Kottayam 30000 108.4 MT 3252000

3252000

Stage 4: Cochin Paradip Sea on Ballast

No. of Days 4.1

Steaming time from Cochin Paradip

At sea - Bunkers - IFO 102.9 15092 per MT 1552967

At sea - Bunkers - MDO 8.2 24048 per MT 197963

1750930

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: Talcher Paradip Rail 5508000 2.0

Stage 2: Paradip Cochin Sea 15328892 10.1

Stage 3: Cochin Kottayam Rail 3252000 2.0

Stage 4: Cochin Paradip Sea 1750930 4.1

Total 25839822 18.2

Charter Hire 8336233

No.of standing days: 14.2 Grand Total 34176056

per day Charter Hire: 587500

Transportation Cost in Rs. per MT 1139

Transportation Cost in Rs. per MTKM 0.41

Distance from Talcher Kottayam 1900 KM

At Talcher Rate(INR) Unit in INR

No.of days 15

Rail Transport from Talcher Kottayam 30000 1341.90 MT 40257000

40257000

Rail + Sea Rail Difference

Transportation Cost in Rs. per MT 1139 1342 203

Transportation Cost in Rs. per MTKM 0.41 0.71

Talcher Coal Mines to Paradip by Rail - Paradip to Cochin by Sea - Cochin to Kottayam by Rail

Cost Heads % age

Land Movement from Talcher Paradip 5508000

Land Movement from Cochin Kottayam 3252000 8760000 25.6

Handling at Ports 9000000 9000000 26.3

Berth Hire+ Port dues+ Pilotage+ Misc. 3870491 3870490.65 11.3

Bunkers at Ports & at Sea 4159332 4159331.64 12.2

Charter Hire 8336233 8336233.33 24.4

Misc. 50000 50000 0.1

Rs. 34176056 34176056 100

0

0.33

Handling at Ports 9000000 35

Berth Hire+ Port dues+ Pilotage+ Misc. 3870491 15

Bunkers at Ports & at Sea 4159332 16

Charter Hire 8336233 33

Misc. 50000 0

25416056 100

Comparison of Transport costs by different modes

ABSTRACT

Talcher Coal Mines to Kottayam by Rail

TATA Consultancy Services

Kakinada Port to Cochin by Sea and Cochin to Palghat Junction by Rail

Food Grains

From To Mode NM KM Time (Days)

Stage 1: (Land Lead to Load Port)

Stage 2 (Load Port to Disport) Kakinada Cochin Sea 1129 2092 3.9

Stage 3:(Land Lead from Disport) Cochin Palghat Rail 130 2

Stage 4: (Disport to Load Port) Cochin Kakinada Sea 1129 2092 3.5

Total (KM) 2222

Vessel details

DWT: 7737

GRT: 6182

Speed: 12 NMPH

Bunkers (IFO) @ Sea per day 12.5 MT 14724 @Kandla

Bunkers (MDO) @ Sea per day 1 MT 20098 do

Bunkers (MDO) @ Port per day 1 MT 20098

Nature of Cargo Food Grains

Type of Vessel General Cargo

Parcel Size 6000 MT

Charter Hire in INR 100000 per day

Stage 1: (Land Lead to Load Port) 0 0 0

At 0 Rate(INR) Unit in INR

No.of days 0.0

Stuffing Charges 0 MT 0

Lift on to Trucks 0 MT 0

Rail Transport from 0 0 6000 0 MT 00

Stage 2 (Load Port to Disport) Kakinada Cochin Sea

Preberthing time (No. of Days) at Kakinada 0

Bunkers before berthing - MDO 0 20098 MT 0

on berthing/anchoring at Kakinada

No. of Days 2.5

Berth Hire Charges 6182 0 per GRT/shift 0

Pilotage 6182 3.5 per GRT 21637

Port Dues 6182 2.05 per GRT 12673

Bunkers at berth - MDO 2.5 20098 MT 50245

Stevedoring 6000 0 MT 0

Lighterage 6000 220 MT 1320000

Wharfage 6000 20 MT 120000

Misc.& Incidental LS 15000 1539555

Steaming time from Kakinada Cochin

No. of Days 3.9

At sea - Bunkers - IFO 49.0 14724 per MT 721502

At sea - Bunkers - MDO 3.9 20098 per MT 78787 800289

At Cochin

Preberthing time (No. of Days) at Cochin 1

Bunkers before berthing - MDO 1 20098 per MT 20098

on berthing at Cochin

No. of Days 3

Berth Hire Charges 6182 0.65 per GRT 36165

Pilotage 6182 6.85 per GRT 42347

Port Dues 6182 2.15 per GRT 13291

Bunkers at berth - MDO 3 20098 MT 60294

Stevedoring 6000 95 MT 570000

Wharfage 6000 44 MT 264000

Misc.& Incidental L.S 20000 1026195

3366038

Stage 3:(Land Lead from Disport) Cochin Palghat Rail

No. of Days 3

Rail Transport from Cochin Palghat 6000 92.4 MT 554400

Lift off from Trucks 6000 MT 0

Destuffing Charges at Destination 6000 MT 0

554400

Stage 4: (Disport to Load Port) Cochin Kakinada Sea on Ballast

No. of Days 3.5

Steaming time from Cochin Kakinada

At sea - Bunkers - IFO 44.1 14724 per MT 649351

At sea - Bunkers - MDO 3.5 20098 per MT 70908

720260

Distance

Rate (Rs/MT)

TATA Consultancy Services

From To Mode Expenses No.of days

Stage 1: (Land Lead to Load Port) 0 0 0 0 0.0

Stage 2 (Load Port to Disport) Kakinada Cochin Sea 3366038 10.4

Stage 3:(Land Lead from Disport) Cochin Palghat Rail 554400 2.0

Stage 4: (Disport to Load Port) Cochin Kakinada Sea 720260 3.5

Total 4640698 15.9

Charter Hire 1394826.4

No.of standing days: 13.9 Grand Total 6035524

per day Charter Hire: 100000

Transportation Cost in Rs. per MT 1006

Transportation Cost in Rs. per MTKM 0.45

Distance from Kakinada Port to Palghat 1250 KM

At 0 Rate(INR) Unit in INR

No.of days 10.0

Rail Transport from Kakinada Palghat 6000 656.60 MT 3939600

3939600

Rail + Sea Rail Difference

Transportation Cost in Rs. per MT 1006 657 -349

Transportation Cost in Rs. per MTKM 0.45 0.53

Kakinada Port to Cochin by Sea and Cochin to Palghat Junction by Rail

Cost Heads %

Land Movement from 0 0 0

Land Movement from Cochin Palghat 554400 554400 9.2

Handling at Ports 1890000 1890000 31.3 189000

Berth Hire+ Port dues+ Pilotage+ Misc. 510113 510113 8.5 153033.8

Bunkers at Ports & at Sea 1651185 1651185 27.4 445820

Charter Hire 1394826.4 1394826 23.1

Misc. 35000 35000 0.6

Rs. 6035524.4 6035524 100 787853.8

5247671 3939600

Difference -1308071 -218

Cost Heads - Sea Segment

Handling at Ports 1890000 34

Berth Hire+ Port dues+ Pilotage+ Misc. 510113 9

Bunkers at Ports & at Sea 1651185 30

Charter Hire 1394826 25

Misc. 35000 1

5481124 100

Comparison of Transport costs by different modes

ABSTRACT

(Contd)