Engineering Circular No.
122-A
|
NO: ENG/MMAM-37(6)/99 Vol. I |
Dated 18th February 2011 |
|
Sub: Addendum to Engineering Circular No. 122 dated 26.08.2010. | |
|
EN
1 Manufacturer without attendance of authorized surveyor; 2 In places where the manufacturer is unable to undertake the servicing as stated at 2.1 above, personnel appropriately trained and certified by manufacturer without attendance of authorized surveyor; 3 In places where manufacturer or his certified and trained facilities as stated at 2.2 above are not available, service personnel trained by some other reputed approved manufacturer in the presence of authorized surveyor.
This issues with the approval of Chief Surveyor with the
Government of India |
|