Further to Engineering Circular No. 120/2010, IMO has issued unified
interpretation in MEPC 56/23 (Annex 17) to resolution MEPC.159(55). The
same is re-produced below for information and compliance.
" For application
of resolution MEPC.159(55), the phrase "installed on board a ship on or
after 1 January 2010" shall be interpreted as follows:
-
For new ships, installations on board ships the keels of which are laid
or which are at a similar stage of construction on or after 1 January
2010.
-
For existing ships, new installations with a contractual delivery date
to the ship on or after 1 January 2010 or, in the absence of a
contractual delivery date, the actual delivery of the equipment to the
ship on or after 1 January 2010."
This issue with the approval of the Chief Surveyor
with the Govt. of India.
Sd/-
(K.M.Rao)
Engineer & Ship Surveyor -cum-DDG(Tech) |